Description
Harlequin 6000 litre Elsan Waste Tanks is a perfect solution for storing toilet waste in Camping and Caravan Parks.
It is designed to safely store caravan toilet waste in a MDPE body compatible with this type of fluid. MDPE tanks are easy to use on site due to the rugged nature of the material. The tank is supplied with lifting eyes as standard for ease of installation.
Durable & Stable – Manufactured from long lasting Medium Density Polyethylene (MDPE) material, Harlequin tanks are the most durable and stable tanks you will find. MDPE tanks are easy to use on site due to the rugged nature of the material.
Prevents Pollution – Helps prevent pollution at Camping and Caravan Parks as chemical waste gets emptied into this below ground tank via emptying points allowing for safe disposal of the waste.
Lockable cover and frame – Lockable pedestrian duty manhole cover and frame enables access to the tank making it an aesthetically pleasing tank.
Features:
-
- Moulded in one piece from durable Medium Density Polyethylene material
- 110mm inlet & rodding connections
- 450mm access lid for emptying
- Galvanised steel lifting eyes for ease of handling
- Risers available for deeper invert levels
- High Level Alarm is available as an option to be purchased at an additional cost
Delivery:
Terms and conditions apply. We deliver tanks direct to site. It is the customer’s responsibility to ensure that adequate access and turning space is provided for a flatbed vehicle and that appropriate offloading facilities and equipment is provided. Please contact us on 01953 665940 for Hiab and other special delivery requests and we will be happy to assist.
Due to recent transport updates, there is extra carriage charge if the delivery address is within the M25, certain postcodes are subject to a congestion charge. Please use the link Click here to view the post codes affected. Then please give us a call for a shipping quote.
These sewage treatment plants replace the septic tanks as the septic tanks are no longer legal.
Lead Time: The estimated lead time for this sewage treatment plant is 3 weeks, but we will confirm this at the point of order.