Description
Harlequin 18,400 Litre HydroClear waste water system
The HydroClear HC50 is ideal for the domestic market, and has been tested to EN 12566-3 and has a CE marking
With its unprecedented 24-month service period and enhanced capacities the HydroClear can dramatically reduce long term operating costs.
The HC50 model can easily be installed using a 2.5-tonne mini digger resulting in simple, cost effective installation with minimal damage to the surrounding area.
The model has a power failure default meaning that even if the power fails the HydroClear will continue performing as a septic tank to ensure continued environmental protection.
This system operates virtually silently, as this range of HydroClear waste water system uses high performance diaphragm blowers.
Odours are minimised as the HydroClear is hermetically sealed and market leading performance means it effectively combats odour production.
The HydroClear HC50 offers a highly flexible solution to space-limited sites. With a pollutant removal level of 97%, and a de-sludging recommendation of 6 months, this model is efficient to run.
Features:
- Modular design that can increase capacity by linking together multiple tanks
- UK Manufactured in high quality MDPE
- Population served: 41-50
- Max Hydraulic load: 10,000 Litres/day
- Organic load: 3,000g BODs/day
- NH3 400g/day
- Total capacity 18,400 Litres
- Energy used 5.7kWs/day
Delivery:
Terms and conditions apply. We deliver tanks direct to site. It is the customer’s responsibility to ensure that adequate access and turning space is provided for a flatbed vehicle and that appropriate offloading facilities and equipment is provided. Please contact us on 01953 665940 for Hiab and other special delivery requests and we will be happy to assist.
Due to recent transport updates, there is extra carriage charge if the delivery address is within the M25, certain postcodes are subject to a congestion charge. Please give us a call for a shipping quote.
These sewage treatment plants replace the septic tanks as the septic tanks are no longer legal.
Warranty:10 years
Lead Time: The lead time on this sewage treatment plant is estimated at 3 weeks, but we will confirm this at the point of ordering.