£0.00
0

HydroClear HC9

Tank Specifications

Length: 2,900mm
Width: 1,620mm
Height: 2,000mm

The above ground air blower housing delivers more reliable and efficient operation, and allows easy access for maintenance.

mm
Capacity: 4,440L

Install Depth: 2,000mm
Inlet Depth: 500mm
Outlet Depth: 630mm

Shipping £115 to mainland UK. We deliver tanks direct to site.  If the delivery address is in Scotland, Ireland or in the London congestion area, please give us a call for a shipping quote.

£2,695.00

Options Total: £ 0


Factory Fit Accessories

Treatment Plant Alarm (£95.00)
Pumped Outlets (£370.00)
Sample chamber c/w Flange & Lid (£215.00)
Extension Neck (£35.00)

Description

Hydroclear HC9 Sewage Treatment Plant

The Harlequin HydroClear range of sewage treatment plants, are the ideal solution to waste water in the domestic market. High Quality engineering, along with analysis software and state-of-the-art manufacturing facilities, all combine to create a unique product which dominates the sewage treatment plant market.  They boast a pollutant removal level of 96.6%.

With its unprecedented 24-month service period and enhanced capacities the HydroClear can dramatically reduce long term operating costs.

The above ground air blower housing delivers more reliable and efficient operation, and allows easy access for maintenance.

The HC9 has outstanding performance, and also is easy to install and has low maintenance costs.  In addition, many other factors are paramount in achieving full CE accreditation, resulting in a quality, good value for money product.

Features of the Hydroclear HC9-NEW

  • Serves 4-9 inhabitants
  • Max Hydraulic load: 1600 Litres/day
  • Organic load: 480g BODs/day
  • Total capacity 4440 Litres
  • Energy used 2.5kWh/day
  • Installed cost effectively
  • Operates virtually silently
  • Only 24 month service period, reducing operating costs
  • HydroClear owners can determine their own desludge intervals meaning potential cost savings of at least £200 per year
  • Has full CE accreditation to BS EN12566-3

 

Inhabitants Served: 4-9

Desludging Interval: 12 months (depending on the number of inhabitants)

These sewage treatment plants replace the septic tanks as the septic tanks are no longer legal.

Delivery: £115 to Mainland UK.  Terms and conditions apply.

Due to recent transport updates, there is extra carriage charge if the delivery address is within the M25, certain postcodes are subject to a congestion charge.  Please use the link Click here  to view the post codes affected. Then please give us a call for a shipping quote.

Lead Times: This sewage treatment plant is in stock, so the lead time is the transportation time.

Additional information

Weight 450 kg
Dimensions 3400 × 1250 × 2560 cm
Manufacturer

Harlequin

Colour

Natural

0
    0
    Your Cart
    Your cart is emptyReturn to Shop